
Description
Amazing opportunity ! Complete gut-down of the building, all new floors walls and joists above the 2nd-floor ceiling were replaced, the attic floor was replaced and like 8 of the 1st-floor joists. All the plumbing was replaced, new supply all copper L-type, all new drain line was replaced, all underground plumbing replaced and new drain tile was installed in the basement. 3 New central high-efficiency furnace and A/C systems. All new electric wiring, new electric panels, new service drop. All new thermal panel windows, new doors, new deck, new roof underneath, new fencing installed.
-
0BEDS
-
N/AACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Amazing opportunity ! Complete gut-down of the building, all new floors walls and joists above the 2nd-floor ceiling were replaced, the attic floor was replaced and like 8 of the 1st-floor joists. All the plumbing was replaced, new supply all copper L-type, all new drain line was replaced, all underground plumbing replaced and new drain tile was installed in the basement. 3 New central high-efficiency furnace and A/C systems. All new electric wiring, new electric panels, new service drop. All new thermal panel windows, new doors, new deck, new roof underneath, new fencing installed.

Digital Millennium Copyright Act